CM 19
Active in Hyperscale Since 2022

SOLVING TODAY'S
CRITICAL HYPERSCALE
PUZZLE: POWER

Since 2022, CM19 has partnered on hyperscale cloud and machine learning infrastructure. Today we secure bankable power at 1GW+ proposed IT scale, originate high-density GPU & TPU agnostic campuses, and lead multidisciplinary design management through Ready-for-Service.

CM19 Story · Established 2022

Active on Hyperscale Since 2022. Now Unlocking the Decisive Piece of Today’s Puzzle: Power.

Founded in 2022, CM19 built its foundation directly inside hyperscale delivery—auditing sites, challenging single points of failure, and aligning complex electrical and mechanical topologies with rapid cloud and machine learning deployment schedules.

As AI training and inference clusters scale toward multi-campus gigawatt portfolios, land and capital alone no longer define a viable project. Power is the bottleneck. CM19 works upstream at strategic transmission nodes and dedicated energy assets to identify, verify, and structure 1GW+ of proposed IT power capacity so compute deploys on schedule.

2022 — Hyperscale Foundation

Multi-Site Hyperscale Technical Due Diligence & Delivery

Technical evaluation, spatial masterplanning, and design governance across pan-regional Cloud and ML portfolios.

2023–2024 — High-Density ML Transition

Liquid-Ready & Hardware-Agnostic Campus Engineering

Bridging hybrid and direct-to-chip liquid cooling topologies up to 90–100 kW/rack for next-generation accelerators.

Today — 1GW+ Power-First Origination

Solving the Global MW Bottleneck Across Core & Frontier Markets

Structuring primary transmission node interfaces, redundant feeder allocations, and integrated sustainable compute hubs.

The Power-First Framework

How CM19 Solves the Power Equation

1GW+ IT SCALE
01 / TRANSMISSION NODES

Primary Node & Bay Verification

Auditing real transmission fault levels, bilateral redundant bay reservations, and direct private-wire or underground feeder corridors.

02 / RAMP VELOCITY

Time-to-Power Phasing

Structuring fast-track initial 24MW–48MW IT launch phases that scale seamlessly into multi-hundred-megawatt full-campus masterplans.

03 / ENERGY ARCHITECTURE

Dedicated & Resilient Supply

Unlocking captive behind-the-meter clean power generation, firm load-balancing infrastructure, and resilient microgrid topologies.

04 / IRR-BACKSOLVED DD

CAPEX & SPOF Risk Mitigation

Reverse-engineering technical due diligence and SPOF remediation directly into project CAPEX waterfalls to protect target investor IRR.

1GW+ Proposed IT Power
60+ Cloud & ML Sites Audited
GPU/TPU Up to 100kW/Rack Spec
Core Specialism · Site Origination

Origination: Finding the Right Site for High-Density, GPU or TPU Agnostic ML Deployment

Silicon roadmaps evolve faster than concrete and primary substations. CM19 originates powered land and technical shells across 1GW+ of proposed IT power capacity, engineered to remain agnostic between high-density GPU clusters and custom TPU pods—preserving full optionality for hyperscalers and institutional infrastructure funds.

Interactive Qualification Benchmark

Select Deployment Envelope

DUAL-SILICON READY ENVELOPE

Future-Proofed 24MW IT Modular AI Pods (Up to 90–100 kW/Rack)

CM19 screens every originated parcel against a unified 6.5 kW/m² hyperscaler white-space benchmark, distributed redundant 4N3 electrical skids, N+1 cooling plant modules, and non-blocking spine optical pathways so tenants can deploy either GPU or TPU generations without structural rework.

Discuss Site Origination →
Rack & Hall Power Density

50 – 100 kW / Rack (6.5 kW/m²)

450 m² gross per 2MW IT module; 4N3 distributed redundant topology

Thermal & Liquid Rejection

DLC + Air Hybrid (N+1 Plant)

Closed-loop manifolds, adiabatic assist & zero-SPOF valving

Structural & Spatial Grid

~20,000 m² Pod Footprint

Heavy point-load slabs & clear overhead busway / CDU headers

Grid Interface & Fabric

Primary HV Node + Diverse Fibre

Dedicated redundant substation bays & multi-route optical entry

GATE 01

Off-Market Land Lock

Direct landowner option or freehold heads of terms with unencumbered cable easements and milestone-conditional completion.

GATE 02

Bilateral Power Allocation

Securing firm MVA import allocations, dual-bus redundant bay reservations, and primary substation interface engineering.

GATE 03

Dual-Track Consenting

Fast-track Phase 1 launch permitting paired in parallel with overarching multi-campus critical infrastructure masterplan approval.

GATE 04

Bankable RFS Pack

Delivering IRR-verified CAPEX models, GPU/TPU test-fits, and phased 24MW IT modular build schedules ready for FID.

Specialism · Design Governance

Multidisciplinary Design Management from Concept to Commissioning

Originating a powered campus is only half the equation. CM19 leads end-to-end Design Management—eliminating mechanical and electrical single points of failure, governing MEP/CSA consultants, and protecting programme milestones for hyperscalers, infrastructure funds, and tier-one facilities management operators.

See Design & DD Mandates →
01

Pre-FEED & Basis of Design

Translating operator SLAs and target IRR constraints into unambiguous electrical, cooling, and spatial specifications.

02

SPOF & Value Engineering

Rigorous N+1 / 2N / 4N3 failure-mode audits across critical electrical skids, chilled-water valving, and fire-life-safety interfaces.

03

IST & Handover Assurance

Aligning design deliverables with long-lead plant procurement, factory witness testing, and operational FM readiness.

Track Record & Selected Mandates

Project References

Selected hyperscale due diligence, frontier sustainable compute development, 1GW+ proposed IT power campus origination, and confidential design governance mandates delivered by CM19.

Hyperscale Cloud & ML Data Hall Infrastructure
8-DISCIPLINE HYPERSCALE AUDIT MATRIX ELEC 2N/4N3 MECH SPOF ML DENSITY FIBRE / COMMS FIRE & CSA CAPEX / IRR 60 SITES SCREENED · CLOUD & ML READINESS
REF 01 · TECHNICAL DUE DILIGENCE

Due Diligence Across 60 Sites for Cloud & ML Deployment

Comprehensive multi-site technical due diligence programme for Google across 60 candidate data centre sites, auditing utility power redundancy, mechanical single points of failure, ML rack density upgrade pathways, and deployment schedule viability.

Portfolio Scale 60 Sites
Deployment Cloud & ML
Client Google

Key Technical Scope & Deliverables:

  • Weighted 8-discipline technical scoring across Architectural, Structural, Fire, Electrical, Mechanical, Security, Communications, and Logistics readiness.
  • Utility 2N / N+1 power verification and mechanical chilled-water valve & piping single-point-of-failure (SPOF) elimination analysis.
  • High-density Machine Learning (ML) rack power density upgrade assessment and spatial white-space / compound modeling.
  • Go / No-Go risk matrices linking required technical remediation CAPEX directly to deployment schedule and target return certainty.
Hyperscale Cloud & AI Infrastructure
Frontier Green Compute & Captive Clean Energy Hub
INTEGRATED TRI-UTILITY MASTERPLAN (100 HA) 40MWp CLEAN + 4-HR STORAGE N+1 Off-Grid Priority 14MW IT CORE 50–100 kW / RACK Tier III AI Training Subsea Fibre Bridge 5,000 m³/DAY DESALINATION Cooling & ESG Water
REF 02 · FRONTIER DEPLOYMENT AFRICA · LOCATION NDA

Integrated Green Compute, Clean Energy & Water Hub in Africa

Lead origination and Pre-FEED structuring of an integrated 100-hectare green compute hub in Africa (exact site confidential under NDA), uniting a Tier III high-density AI data centre, captive clean power generation with multi-hour storage, and desalination infrastructure at subsea fibre convergence.

Compute & Land 14MW IT · 100 Ha
Captive Power 40MWp + Storage
Macro CAPEX ~$500M USD

Major Programme Components (Location Confidential):

  • Land & Engineering Status: 100 Hectares secured under LOI; High-Level Scope of Work (SOW) completed and ready for Detailed Design (FEED).
  • AI Data Centre Core: 14MW IT Load (Phase 1), Tier III design, engineered for high-density AI training & ML workloads from 50kW to 100kW per rack.
  • Captive Off-Grid Power Priority: 40MWp dedicated renewable generation + 4-hour energy storage + N+1 backup redundancy (with utility grid as tertiary backup) enabling sustainable green compute offloading.
  • Utility & ESG Water Plant: 5,000 m³/day Seawater Reverse Osmosis (SWRO) plant supporting data centre cooling make-up and community potable water supply.
  • Capital Stack (~$500M USD): Structured as 70% Senior Debt (~$350M targeting DFIs, Export Finance & Commercial Banks) and 30% Class A Equity (~$150M) under mandate.
Pre-FEED · Green Compute Offloading
1GW+ High-Density AI Factory Campus Architecture
1GW+ PROPOSED IT SCALE · 24MW MODULAR AI PODS 1GW+ IT PIPELINE 2N Dedicated Feeder Bays 90–100 kW/Rack GPU/TPU Direct Transmission Node White Space (6.5kW/m²) 4N3 Elec & N+1 Cooling 5 Campuses (Alpha–Epsilon)
REF 03 · ML FUND INFRASTRUCTURE ORIGINATION LOCATION CONFIDENTIAL

1GW+ Proposed IT Power — Multi-Campus ML Fund Origination

Upstream buy-side power and land origination of a 5-campus high-density ML portfolio (Nodes Alpha–Epsilon) representing 1GW+ of proposed IT power capacity for institutional ML infrastructure investment (all site locations strictly confidential under NDA).

Proposed IT Scale 1GW+ IT Power
Campus Architecture 5 Nodes · 24MW Pods
Hardware Spec 90–100kW GPU/TPU

Anonymised 1GW+ IT Portfolio & Technical Architecture:

NODE ALPHA: 132MW IT Masterplan (6 Pods)
NODE BETA: 216MW IT Masterplan (9 Pods)
NODE GAMMA: 336–456MW IT Flagship Campus
NODE DELTA: 96–108MW IT Masterplan
NODE EPSILON: 96–108MW IT Masterplan · Total Proposed Scale: 1GW+ IT Power
  • Standardised 24MW IT Modular Pod (~20,000 m²): 6.5 kW/m² hyperscaler specification, GPU & TPU agnostic up to 90–100 kW/rack, Distributed Redundant 4N3 electrical skids, N+1 cooling plant, and 48-hour fuel resilience.
  • Dedicated Primary Transmission Node Interface: Bilateral dual-bus redundant feeder bay allocations enabling fast-track 24MW–48MW IT initial phase ramps alongside multi-campus buildout.
  • Zero-Drawdown Four-Gate Protocol & Financial Model: Off-market conditional land locks (drawdown strictly contingent on power and consenting milestones) paired with IRR-backsolved 70% senior debt / 30% private equity CAPEX models.
1GW+ Proposed IT Portfolio · NDA Protected
Mission-Critical MEP Engineering & Design Management
MULTIDISCIPLINARY STAGE-GATE GOVERNANCE BOD / FEED SLA Alignment MEP / SPOF Zero-Downtime 3D BIM / QA Clash-Free IST & FM Handover STRICT NDA PROTOCOL · TIER-1 FACILITIES MANAGEMENT
REF 04 · DESIGN MANAGEMENT CLIENT CONFIDENTIAL

Multidisciplinary Design Management for Major FM Company

End-to-end technical design management mandate for a tier-one international Facilities Management (FM) group (client confidential under NDA), coordinating critical electrical, mechanical, life-safety, and operational maintainability upgrades.

Role Design Lead
Counterparty Major FM Tier-1
Disclosure Strict NDA

Key Technical Scope & Deliverables:

  • Chairing multidisciplinary MEP and CSA design coordination reviews across engineering stage gates.
  • Embedding concurrent maintainability, valve/switchgear isolation safety, and lifecycle FM operability directly into detailed engineering packages.
  • Technical submittal sign-off, clash resolution, and zero-downtime live-environment commissioning sequence governance.
Mission-Critical Engineering & FM
Partner With CM19

Get in Touch with CM19

Whether you are a hyperscaler expanding high-density GPU/TPU capacity, an infrastructure fund originating powered land, or a landholder with strategic grid access, our leadership team engages directly under strict confidentiality.

Registered Headquarters

CM19 LTD
71–75 Shelton Street
London, England, WC2H 9JQ

Active Advisory Footprint

London HQ · EMEA · Frontier Africa & Global Hyperscale Mandates

Encrypted direct dispatch under strict NDA protocol.